The additions made to the existing hospital during this project were 129,720sf with 425 tons of refrigeration with chilled water, and 96 new beds.
Location: Atlanta, GA
The additions made to the existing hospital during this project were 129,720sf with 425 tons of refrigeration with chilled water, and 96 new beds.
Location: Atlanta, GA